
Description
Adaptation of Absheron EPS platform (topside, jacket, link to existing system via bridge), 34 km of 12” fully rated (500 bar) insulated multiphase flow line, 34 Umbilical for controls, chemical and communication.
- Design of lightning protection
- Design HVAC systems
- Safety Declarations
- Construction Plan
- Project passports